서은플랜트기술

본문 바로가기 주메뉴 바로가기

Technical Support

Domestic / Overseas Certification

TECHNOLOGY

Domestic / Overseas Certification

Domestic Certification & Inspection Support

Major Domestic Inspection Authority

We provide full agency service for certification and inspection conducted by major domestic regulatory authority, including KEA, KOSHA, KGS and the Fire Services Act authority.
Our service covers the preparation of all required documentation, on-site inspection readiness support through training and guidance, and direct attendance at inspections — ensuring successful final approval on behalf of our client.

  • KEA

  • KOSHA

  • PSM

  • KGS

  • Fire Defense Regulation

Certification Process Flow

  1. STEP1

    Identify the competent inspection authority responsible for the applicable equipment

  2. STEP2

    Prepare drawing, calculation sheet, and all required documentation in compliance with applicable domestic regulation

  3. STEP3

    Submit application and manage the process (handling all communication with the relevant authority on behalf of the client)

  4. STEP4

    Conduct meeting with the inspection officer and address all technical comment

  5. STEP5

    Accountable for document review and approval

  6. STEP6

    Provide guidance on preparation requirement and key precaution for manufacturing inspection

  7. STEP7

    Accountable through to issuance of the final approval certificate

Import Equipment Inspection Support

KEA Import Inspection

We understand the significant challenges that importers have faced since the revision of the Korea Energy Agency (KEA) import inspection regulation in December 2017, and we are committed to resolving these difficulties alongside our client.

Working in close collaboration with importer, exporter, and client, we manage all aspects of the approval process — including preparation of approval documentation, on-site readiness, and on-site attendance — to ensure efficient and timely processing.

  • Pressure Vessel

  • Heat Exchanger

  • Reactor

  • Autoclave

  • Sterilizer

  • Retort

  • Agitator

  • Extractor

  • Evaporator

  • Dyeing Machine

  • Biosimilar

  • Bioreactor

  • Fermenter

KEA Inspection Procedure

KEA Inspection Procedure

We have a proven track record of successfully managing import inspection processes with numerous countries, including China, Japan, the United States, India, France, the Czech Republic, the Netherlands, and Germany.

Pioneer Certification Track Record

Pioneer Certification Track Record

The term "first inspection" refers to cases where the inspection number ends with "00001".

KEA Import Inspection Number Format

2018 - 49 - 10 - 00001
Inspection Year / Country Code / Welding & Structural Category / Serial Number

We fully understand the challenges faced by importer, and encourage you to contact us early to avoid missing critical delivery deadline.
(Our import inspection agency service is also available for inspection authority other than Korea Energy Agency (KEA).)
For further information, please visit our company blog.